ANALISIS BIAYA DAN WAKTU DENGAN METODE NILAI HASIL (STUDI KASUS: PRESERVASI JEMBATAN SEMBAYAT DI GRESIK)
Sari
Teks Lengkap:
PDFReferensi
Asmaroni, D., & Setiawan, A. (2020). Penggunaan Metode Nilai Hasil (Earned Value Analysis) Terhadap Biaya Dan Waktu Pada Proyek Konstruksi Bangunan Perumahan (Studi Kasus Proyek Konstruksi Bangunan Perumahan PT. Graha Praja Kencana Di Desa Ceguk Kecamatan Tlanakan Kabupaten Pamekasan). Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil, 3(1), 31–39. https://doi.org/10.25139/jprs.v3i1.2439
Bonny, A., Oetomo, W., & Marleno, R. (2022). Analysis of Time and Cost Control Using The Earned Value Method In Well Pad Hilling and Compacting Work In The PT. Pertamina Hulu Rokan Riau Province. Devotion Journal of Community Service, 3(14), 2802–2814. https://doi.org/10.36418/dev.v3i14.339
Gardjito, E. (2018). Pengendalian Jadwal Dan Anggaran Terpadu Dengan Metode Earned Value Analysis Pada Pekerjaan Konstruksi. UKaRsT, 1(1), 19. https://doi.org/10.30737/ukarst.v1i1.82
Huda, K., Mulyadi, L., & Santosa, A. (2018). Analysis Of Time And Cost Performance With Earned Value Method In Lecture Building Project Development Of Nutrition Department At East Kalimantan Health Polytechnic. International Journal Of Scientific & Technology Research, 7(2).
Irawan, D., Sadalia, I., & Muda, I. (2023). Earned Value Analysis Method As A Cost And Time Performance Analysis (Case Study LAU SIMEME DAM Construction Project KSO Between PT. Wijaya Karya Persero.Tbk and PT. Bumi Karsa). International Journal of Educational Review, Law And Social Sciences, 3(2).
Isnaeni, M., Putri, N. A., Martina, N., & Hasan, M. F. R. (2021). Kesesuaian Biaya dan Waktu Proyek “Z” Dengan Konsep Nilai Hasil. Jurnal Konstruksia, 13(1).
Przywara, D., & Rak, A. (2021). Monitoring of Time and Cost Variances of Schedule Using Simple Earned Value Method Indicators. Applied Sciences, 11(4), 1357. https://doi.org/10.3390/app11041357
Purba, A. S. E. (2020). Comparison Analysis Of Cost And Time In Situ Concrete Implementation Method With Pre Cast. Jurnal Mekintek : Jurnal Mekanikal, Energi, Industri, Dan Teknologi, 11(2), 46–52. https://doi.org/10.35335/mekintek.v11i2.13
Puspita, N., & Lutfiansyah, Y. (2020). Cost and Time Performance Analysis with Concept of Earned Value (Case Study Jakarta—Cikampek II Elevated Project). :: :: IJIEEB :: International Journal of Integrated Education, Engineering and Business ::, 3(2), 64–70. https://doi.org/10.29138/ijieeb.v3i2.1167
Rahmanto, T., & Janizar, S. (2022). Pengendalian Biaya Dan Waktu Dengan Metode Earned Value Proyek Familia Urban Bekasi. Jurnal Teknik Sipil Cendekia (JTSC), 3(2), 16–27. https://doi.org/10.51988/jtsc.v3i2.48
Rosyati, R., & Sudarmanta, J. (2022). Evaluasi Proyek Menggunakan Metode Earned Value Analysis Studi Kasuis Pada Proyek Pembangunan Tambah Ruang Kelas SMPN 17 Tangerang Selatan. Structure (Jurnal Sipil), 2(2), 49. https://doi.org/10.31000/civil.v2i2.7000
Salsabila, J. R., Atmaji, F. T. D., & Pramoso, A. (2020). Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis: A Case Study of Shot Blast Machine. Jurnal Ilmiah Teknik Industri, 19(2), 223–234. https://doi.org/10.23917/jiti.v19i2.11961
Setiawan, R., & Handayani, A. (2022). Analysis of Ramp on Off Costs And Time Using the Earned Value Analysis (EVA) Method. ADRI International Journal of Civil Engineering, 7(1), 144–150. https://doi.org/10.29138/aijce.v7i1.74
DOI: https://doi.org/10.33559/eoj.v5i4.1741