ANALISIS PENGARUH STRUKTUR ORGANISASI TERHADAP KINERJA PROYEK PEMBANGUNAN JEMBATAN EMBUNG SUNGSANG
Sari
The performance of a project can be influenced by its organization. Good organizational management can help ensure that responsibilities and tasks are clearly divided among project team members, that communication is maintained well, and that the project can run according to schedule. Project management can also help organizations discover and resolve problems that arise during a project. An effective project organizational structure will achieve project objectives in accordance with the expected time, cost and budget. The aim of this research is to assist the project party in identifying problems that exist in the project organizational structure and also provide solutions related to problems that exist in the project structure. Meanwhile, the most influential is quality with a score of 3.42% greater than the time and cost indicators.
Kata Kunci: organization, Management, Construction
Teks Lengkap:
PDFReferensi
Adeswastoto,H. (2022). Pemetaan Kondisi Saluran Drainase Primer Berbasis Sistem Informasi Geografis Kecamatan Bangkinang Kota. Jurnal ArTsip, 05(01),52-59. Retrievedfromhttp://journal.universitaspahlawan.ac.id/index.php/artsip/article/view/17073
Agusjaya, S. A., Carlo, N., & Zulherman, Z. (2023). Analisis Pengaruh Faktor Modal Kerja terhadap Kinerja Proyek Konstruksi Gedung di Kota Jambi. Jurnal Ilmiah Universitas Batanghari Jambi, 23(3), 2842. https://doi.org/10.33087/jiubj.v23i3.4400
Andri, N. A. (2007). Optimalisasi Penjadwalan Proyek. Pada Pembangunan Gedung Khusus (Laboratorium) Stasiun Karantina Ikan Kelas 1 Tanjung Mas Semarang. Skripsi: Universitas Diponegoro.
Bastian, R., & Rulhendri, R. (2023). Perencanaan Pelebaran Jembatan Desa Tamansari. Jurnal Pengabdian Masyarakat UIKA Jaya: SINKRON, 1(3), 106. https://doi.org/10.32832/jpmuj.v1i3.1915
Dziuba, S. T., Ingaldi, M., & Zhuravskaya, M. (2020). Employees’ Job Satisfaction and Their Work Performance as Elements Influencing Work Safety. System Safety: Human-Technical Facility-Environment, 2(1), 18–25. https://doi.org/10.2478/czoto-2020-0003
Fahmi, D. N., Anwar, S., & Rozy, N. (2017). Analisis Manajemen Konstruksi Proyek Jembatan Pakubeureum Kecamatan Kadipaten Kabupaten Majalengka. Jurnal Konstruksi dan Infrastruktur, 6(6).
Hapsari, A. N. (2023). Analisis Manajemen Risiko Kecelakaan Kerja Pada Pekerjaan Fondasi dan Pile Cap Proyek Konstruksi Jembatan Beton dengan Standar AS/NZS 4360: 2004.
Kamaludin, I. T. M. (2021). Rescheduling Proyek Konstruksi Jembatan Palu V Menggunakan Microsoft Project. Penerbit Adab.
MUKTI, F. F. (2019). Analisa Faktor Risiko Pada Proyek Konstruksi Jembatan Mahakam IV Samarinda. Kurva Mahasiswa, 1(1), 716-730.
Pythaloma, A. P., & Dwigantara, P. R. (2015). Analisis Potensi Terhambatnya Pelaksanaan Pekerjaan Pada Proyek Jembatan Pasir Kali Wulan Dalam Penerapan Manajemen Proyek (Doctoral Dissertation, Fakultas Teknik UNISSULA).
Solicha, A. A., Lidyaningtias, D., & Wahiddin, W. (2021). Aplikasi Bim Pada Pembangunan Proyek Jembatan Umbul Kaji Kabupaten Malang. Jurnal JOS-MRK, 2(3), 304–309. https://doi.org/10.55404/jos-mrk.2021.02.03.304-309
Susanti, B., Said, A., & Kunci, K. (2019). Alokasi Biaya Penyelenggaraan Sistem Manajemen Keselamatan dan Kesehatan Kerja pada Proyek Konstruksi Jembatan di Kota Palembang. In Seminar Nasional AVoER XI.
Tabrani, N., Mulia, A. P., & Anas, R. (2023). Analisis Faktor Keterlambatan Pelaksanaan Proyek Jembatan Di Provinsi Sumatera Utara. Journal of Syntax Transformation, 4(1).
Wijoyo, A., Kunnaefi, A., Kurniawan, D., Zainudin, M., Gustamal, M. A., & Sulistiana, O. (2024). Fungsi Organisasi Pada Manajemen Proyek. Jurnal Ilmu Komputer Dan Science, 3(2), 537–541. https://journal.mediapublikasi.id/index.php/oktal
Wirawan, A., Suhariyanto, & Sugiarto, A. (2023). Project Planning Pembabngunan Jembatan Kretek 2 Kabupaten Bantul. Jurnal Online Skripsi Manajemen Rekayasa Konstruksi, 4(4), 21–28.
DOI: https://doi.org/10.33559/err.v4i1.2974
Refbacks
- Saat ini tidak ada refbacks.
Anda Pengunjung Ke-