FAKTOR-FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PROYEK PEMBANGUNAN BOX CULVERT JEMBATAN JALAN SUDIRMAN DAN JALAN AGUSSALIM KECAMATAN BANGKINANG KOTA
Sari
Bridges are structures built to connect transportation activities due to obstacles such as rivers, lakes, swamps and other obstacles. As part of drainage systems and bridge infrastructure, box culverts help transport and control water flow. In implementing bridge construction projects there are several tendencies that influence performance, one of which is time management. The aim of this research is to identify the components that influence the length of time the box culvert bridge construction project on Jalan Sudirman and Jalan Agussalim, Bangkinang City subdistrict lasts. This research adopts a descriptive quantitative approach, a quantitative method rooted in the philosophy of positivism was chosen because it allows the collection of numerical data in a systematic and structured manner. Data collection was carried out through questionnaire data. The results of the research show that the main components causing the box culvert bridge construction project on Jalan Sudirman and Jalan Agussalim, Bangkinang Kota subdistrict to be delayed are the lack of expertise and skills as well as work motivation for workers in the field with a respondent result of 54% lack of expertise and skills and desire to work among workers in the field, according to 54% of respondents, the owner's work plan statement often changes based on the results of 51% of respondents and material accuracy with a respondent result of 51%.
Keywords: Time Management, Box Culvert, Construction Project Delays
Teks Lengkap:
PDFReferensi
Adeswastoto,H. (2020). Tinjauan Kondisi Saluran Primer di Kecamatan Bangkinang Kota. Jurnal ArTsip, 03(01),78-85. Retrieved from https://journal.universitaspahlawan.ac.id/index.php/artsip/article/view/10105/7710
Budisuanda, 2011. Advanced & Effective Project Management.
Dipohusodo I. 1996. Manajemen Proyek dan Konstruksi. Penerbit : Gramedia, Jakarta.
Singarimbun, 1995, Marketing Management Analyzing, planning, implementation controling.
Ervianto, Wulfram I, 2004. Teori Aplikasi Manajemen Proyek Konstruksi. Yogyakarta: Empat.
Fatahillah, I. (2023). Jembatan Dermo Ruas Jalan Dr. Sutomo (Bangil) KM Sby 46, 99 Bangil, Pasuruan. Prosiding Kerja Praktek, 1(1), 23-34.
Karuru, R. S., Lioni, C. Z., & Mantong, T. M. P. (2024). Review Design Box Culvert Terhadap Banjir Sungai Cangak Di Kecamatan Candipuro Kabupaten Lumajang. Surya Teknika, 1(2), 15-20.
Lesmana, M. O. (2023). Analisis Perhitungan Struktur pada Box Culvert Jalan Kereta Api (Studi Kasus BH 41 Lintas Medan-Binjai).
Ni'mah, H. (2022). Analisis Biaya, Waktu Dan Kekuatan Bekisting Perancah Kombinasi Kayu Galam Dan Tie Rod Pada Jembatan Box Culvert Sungai Hanau Cs Kabupaten Tanah Bumbu (Doctoral dissertation, Universitas Islam Kalimantan MAB).
Rangan, P. R., & Matana, H. (2021). Perbandingan Perencanaan Jembatan To’kanna Nanggala Menggunakan Box Culvert Dan Gelagar Profil Baja. Dynamic Saint, 6(1).
Romdani, R. F., Alihudien, A., & Muhtar, M. (2022). Alternatif Struktur Box Culvert Sebagai Pengganti Girder Jembatan Kali Jompo, Jember. Jurnal Smart Teknologi, 4(1), 24-34.
Saputri, N. E., Banjarsanti, S. S. N., & Ananda, F. (2024). Sinergi Mahasiswa dan Pemerintah dalam Proyek Rehabilitasi Jembatan Box Culvert di Kecamatan Muara Badak Melalui Pendanaan Bankeu. Jurnal Pengabdian kepada Masyarakat Nusantara, 6(1.1), 508-516.
Sita, T., Suryan, V., & Chandra, P. W. A. (2024). Analisis Penyelidikan Tanah Box Culvert STA. 4+ 550 dan STA. 8+ 575 dengan Sondir Manual Paket I. 4–Pembangunan Jalan Kawasan Industri Terpadu (KIT) Batang. Jurnal Talenta Sipil, 7(1), 344-353.
Widhiawati, Astina dan Joni. 2012. Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Pekerjaan Proyek Konstruksi di Kabupaten Tabanan. Jurnal Ilmiah Infrastruktur Teknik Sipil, Universitas Udayana. Denpasar.
DOI: https://doi.org/10.33559/err.v4i1.2975
Refbacks
- Saat ini tidak ada refbacks.
Anda Pengunjung Ke-