EVALUASI EFEKTIFITAS PENERAPAN KONSEP MANAJEMEN PROYEK PADA PELAKSANAAN PROYEK PELEBARAN JALAN MENAMBAH LAJUR BATAS KABUPATEN KAMPAR-BATAS KOTA BANGKINANG
Sari
In construction project activities, planning is used as a reference material for project management and become a standard for project implementation which includes: cost factors, time factors and closely related quality factors on project performance. This research is limited to the scope of physical activities/construction stages with objectives to evaluate the effect of the effectiveness of applying project management concepts on project implementation road construction in terms of cost, time and quality on project performance. In the context of a road construction project in Kampar Regency, this research aims to evaluate the effectiveness of applying project management concepts in improving project performance. This research also analyzes the influence of cost, time and quality factors on overall project performance. Using a multiple linear regression approach, the research results show that cost and time factors have a positive and significant influence, while quality factors have a smaller contribution to improving project performance. This research uses a qualitative and quantitative descriptive approach with multiple linear regression analysis methods. Therefore, the results obtained will depend on primary data collected through questionnaires and interviews. This research can help in identifying and managing risks associated with project implementation, thereby minimizing delays and additional costs.
Keywords: cost factor, time factor, quality factor, validity test, linear regression model.
Teks Lengkap:
PDFReferensi
Adeswastoto,H. (2023). Pengaruh Volume Kendaraan Terhadap Kerusakan Jalan Pada Perkerasan Lentur (Studi Kasus: Ruas Jalan Raya Pekanbaru – Bangkinang KM 56-KM 59 Kabupaten Kampar. Jurnal ArTsip, 06(01), 19-29. Retrieved from https://journal.universitaspahlawan.ac.id/index.php/artsip/article /view/24208/17003
Barrie, Donald S Paulson, Body C, Sudinarto, 1999. Manajemen Konstruksi Profesional, Penerbit Erlangga, Jakarta.
Dewi Daan. Modul III: Uji Validitas dan Reliabilitas. Statistika Terapan. Universitas Dipenogoro. 2018: 1-14.
Dipohusodo I., 1999. Manajemen Proyek Konstruksi, Jilid 1, Penerbit Kanisius, Jakarta.
Ervianto I. Wulfram, 2003. Teori Aplikasi Manajemen Proyek Konstruksi, Penerbit Andi, [3] Yogyakarta.
Ghozali, imam. (2016). Aplikasi Analisis Multivariete Dengan Program IBM SPSS 23. Edisi 8. Semarang: Badan Penerbit-UNDIP Herianto, H. (2020). Teknik Menulis Artikel Konseptual.
Gilbert, D. R. Jr, Freeman, R E., Stones, J A.F. 1999. Manajemen, Jilid II, Prenhallindo, Jakarta.
Herianto, H. .2020. Telaah Kurikulum 2013: Hasil Revisi Tahun 2018
Husen Abrar ,2009. Manajemen Proyek, Penerbit Andi,Yogyakarta. Pujdosumarto,
Muljadi. 1991. Evaluasi Proyek. Penerbit Liberti, Yogyakarta.
Jusmiana, A., & Herianto, H. (2020). Suplemen Materi Statistik Terapan dalam Ilmu Kesehatan.
Sapada, A. O., & Arsyam, M. (2020). Ilmu Pengetahuan dan Teknologi Menurut Pandangan Islam.
Simanjuntak P., Gray C.,dkk, 1992. Pengantar Evaluasi Proyek. Jilid II, Penerbit Gramedia Pustaka, Jakarta.
Simanjuntak, Mohammed Axel, Evaluasi Efektivitas Penerapan Konsep Manajemen Proyek Pembangkit Listrik Tenaga Biomassa 9,9 Megawatt Deli Serdang, 2022.
Sunarti, dan Selly Rahmawati. 2014. Penilaian Dalam Kurikulum 2013 Membantu Guru dan Calon Guru Mengetahui Langkah-Langkah Penilaian Pembelajaran Yogyakarta: CV Andi Offiset.
Wibowo Arief Eko (2003). Pengendalian Sumber Daya dan Waktu dengan Program Primavera Project Planner Versi 3.1 (Studi Kasus pada Proyek Pembangunan Laboratorium Terpadu Universitas Islam Indonesia Jogjakarta)
DOI: https://doi.org/10.33559/err.v4i1.2976
Refbacks
- Saat ini tidak ada refbacks.
Anda Pengunjung Ke-