IDENTIFIKASI KETERLAMBATAN PEKERJAAN PEMBANGUNAN GEDUNG KULIAH S (SBSN) UIN SJECH M. DJAMIL DJAMBEK BUKITTINGGI

Muhammad Ridho Alfariz, Surya Eka Priana, Jon Hafnil

Sari


During project implementation, several obstacles occurred, one of which was work delays. Delays in construction projects can be interpreted as failure to meet the completion time for construction work as stated in the contract. This research aims to determine the use of the concept of the Fault Tree Analysis (FTA) method and to determine the control and causes of delays on projects. The results of the research show that the work that experienced delays in the UIN Sjech M. Djamil Djambek Bukittinggi Lecture Building (SBSN) construction project was work in weeks 2, 11, 12, 13, and 21. This was also influenced by several things such as weather factors. , lack of workers, lack of experts, ordering materials that are difficult to obtain, delays in architectural work, and inefficient division of labor. The conclusion of this research is to pay attention to delay factors in construction implementation to anticipate possible delays.Keywords: Delay; Project; Fault Tree Analysis; Controlling.

Teks Lengkap:

PDF

Referensi


Asnuddin, S., Tjakra, J., & Sibi, M. (2018). Penerapan Manajemen Konstruksi Pada Tahap Controlling Proyek.(Studi Kasus: Bangunan Laboratorium Fakultas Teknik Universitas Sam Ratulangi Manado). Jurnal Sipil Statik, 6(11). Sastrohadiwiryo, S., & Syuhada, A. H. (2021). Manajemen tenaga kerja Indonesia. Bumi aksara.

Astari, N. M., Subagyo, A. M., & Kusnadi, K. (2022). Perencanaan Manajemen Proyek dengan Metode CPM (Critical Path Method) dan PERT (Program Evaluation and Review Technique). Konstruksia, 13(1), 164-180

Berry paulson JR, Sudinarto, 1995, Manajemen Konstruksi Profesional, Eriangga, Jakarta.

Brown, R. D. dan G. J. Petrello. 1976. Introduction to Business, An Integration Approach. Beverly Hills:Glen Coe Press.

Clough dan Sears. (1991). Construction Project Management. New Jersey (US): John Willey & Sons Inc.

Conterius, Y. (2018). Kajian Manajemen Pelaksanaan Pemeliharaan Jalan pada Ruas Jalan Oben Bone Kabupaten Kupang NTT. JUTEKS: Jurnal Teknik Sipil, 3(1), 250-253.

Darim, A. (2020). Manajemen perilaku organisasi dalam mewujudkan sumber daya manusia yang kompeten. Munaddhomah: Jurnal Manajemen Pendidikan Islam, 1(1), 22-40.

Ericson. C., (1999), Fault Tree Analysis, http://www.fault-tree.net/papers/clemens-eventtree.pdf

Ervianto, W. I. (2023). Manajemen proyek konstruksi. Penerbit Andi.

Komarujjaman, U. A., Nurdin, A. L., Feriska, Y., & Diantoro, W. (2023). Perencanaan Biaya Keselamatan dan Kesehatan Kerja (K3) pada Proyek Konstruksi Bangunan (Studi Kasus di Gedung Kantor Pemerintahan Terpadu Kabupaten Brebes). Era Sains: Jurnal Penelitian Sains, Keteknikan dan Informatika, 1(1), 66-77.

Ladjao, J., Yurianto, E., Limanto, S., & Wicaksono, E. (2016). Analisis Faktor Penyebab Keterlambatan Pada Bangunan Tinggi di Surabaya. Jurnal Dimensi Pratama Teknik Sipil, 5(1).

Oka, J., & Kartikasari, D. (2017). Evaluasi Manajemen Waktu Proyek Menggunakan Metode Pert Dan Cpm Pada Pengerjaan “Proyek Reparasi Crane Lampson” Di Pt Mcdermott Indonesia. Journal of Applied Business Administration, 1(1), 28-36.

Pessak, R. H., Mawuntu, J. R., & Setiabudhi, D. O. (2021). Instrumen Hukum Penyelenggaraan Kerja Sama Pemerintah Daerah dalam Pembangunan di Bidang Jasa Konstruksi. Amanna Gappa, 91-105.

Priana, S. E. (2018). Analisa Faktor Penyebab Kerusakan Jalan (Studi Kasus Ruas Jalan Lingkar Utara Kota Padang Panjang). Rang Teknik Journal, 1(1).

Priana, S. E. (2018). Pengaruh Kualifikasi Kontraktor Terhadap Kualitas Pekerjaan Proyek Konstruksi Di Kabupaten Tanah Datar. Rang Teknik Journal, 1(2).

Sastrohadiwiryo, S., & Syuhada, A. H. (2021). Manajemen tenaga kerja Indonesia. Bumi aksara.




DOI: https://doi.org/10.33559/err.v3i2.2514

Refbacks

  • Saat ini tidak ada refbacks.


Anda Pengunjung Ke- Flag Counter