ANALISA FAKTOR PENYEBAB DAN AKIBAT CONTRACT CHANGE ORDER PADA PROYEK KONTRUKSI GEDUNG DI KABUPATEN LIMAPULUH KOTA
Sari
The implementation of construction work is limited by time, quality and cost. There are many problems that can cause changes to work items. In the area of West Sumatra, especially in Limapuluh Kota Regency, in the completion of construction projects, contract change orders often occur. The purpose of this study is to find out what factors are the causes of contract change orders on building construction projects and the impact of change orders on costs and time on building construction projects in Lima Puluh Kota Regency. This research is quantitative. The results of the study found that the causes of contract change orders according to contractors and owners were design changes, work scope changes, work delays, specification changes, work implementation errors, and incompatibility of field conditions with those listed in the contract with different percentages for each. Meanwhile, the effect of CCO on time and cost is with a percentage of <10%.
Teks Lengkap:
PDFReferensi
Barrie, Donald, & Paulson, B. C. (1992). Professional Construction Management, Third Edition. Singapore: Mc Graw-Hill.
Fisk, R, E., & D, R. W. (2006). Construction Project Administration, Eight Edition. New Jersey: Prentice Hall.
Gilberth, R. D. (1992). Managing Construction Contract Operational Control for Commercial Risk, Second Edition. John Wiley & Sons.Inc.
Hanna, A. S. (2002). Statistical-Fuzzy Approach to Quantify Cumulative Impact of Change Order . Journal of Construction Engineering and Management, ASCE. Vol.116.p.253.
Hsieh, Ting-Ya, Lu, Tong, S., & Chao-Hui, W. (2004). Statistical Analysis of Causes for Change Order in Metropolitan Public Work. International Journal of Project Management, 22, p.679-686.
Levi, S. M. (2002). Project Management in Construction, Fourth Edition. New York: Mc Graw-Hill.
Schaulfelberger, E, J., & Holm, L. (2002). Management of Construction Project Constructor's Perspective, Eight Edision. New Jersey: Prentice Hall.
Soeharto, R. (1997). Management Proyek dari Konseptual Sampai Operasional, Edisi Kedua. Jakarta: Airlangga.
Wati, M. (2006). Analisa dan Perhitungan Change Order Pada proyek Perkerasan Jalan di Kalimantan Timur.
DOI: https://doi.org/10.33559/eoj.v4i1.1039
Refbacks
- Saat ini tidak ada refbacks.
Negara Pengunjung

Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.