MODEL INTERAKSI STAKEHOLDER PADA PEMBEBASAN LAHAN PEMBANGUNAN JALAN TOL RUAS PADANG – SICINCIN
Sari
Toll roads are an effective means of transportation to shorten the distance between regions. With a short distance, the cost of accommodation of goods will decrease and increase accessibility, thereby encouraging economic improvement and community development. One of the toll roads currently under construction in West Sumatra is the Padang-Pekanbaru toll road. The Padang-Sicincin section is part of the large project with a length of 30.4 km. Since being carried out in 2018 the progress of the work has only reached 45.2%, meaning that there are obstacles that slow down the completion of the work. From the literature study, it was found that the main cause of delay was land acquisition. The various literatures also describe the resolution of disputes involving stakeholders. Stakeholder management is one of the indicators of project success. To find out the model of stakeholder interaction on the Padang-Sicincin spatial toll road project in terms of land acquisition, a social network analysis was carried out based on a literature study related to land acquisition, followed by the creation of a stakeholder relationship matrix. From the results of the analysis, it is found that stakeholders as the main actors in land acquisition are local governments as mediators and messengers between land owners and other stakeholders involved in land acquisition.
Keywords: Stakeholders, Land Acquisition, Toll Roads, Social Network Analysis.
Teks Lengkap:
PDFReferensi
Akbar, A. R., Sulistyorini, R., & Lusmeilia, A. (2021). Faktor yang menentukan keberhasilan pembangunan jalan tol (studi kasus jalan tol Lematang - Kotabaru di Propinsi Lampung) | REKAYASA: Jurnal Ilmiah Fakultas Teknik Universitas Lampung. https://rekayasa.ft-sipil.unila.ac.id/index.php/rjits/article/view/12
Almahmoud, E., & Doloi, H. (2015). Assessment of social sustainability in construction projects using social network analysis. Facilities, 33, 152–176. https://doi.org/10.1108/F-05-2013-0042
Amoatey, C., & Hayibor, M. V. K. (2017). Critical success factors for local government project stakeholder management. Built Environment Project and Asset Management, 7(2), 143–156. https://doi.org/10.1108/BEPAM-07-2016-0030
Anas, R., Tamin, O. Z., Tamin, R. Z., & Wibowo, S. (2017). Measuring regional economic impact of cipularang toll road investments: Using an input-output model (case study: Bandung district). International Journal of Civil Engineering and Technology, 8(10), 796–804.
Arifah, W. P. (2020). Pelaksanaan Pengadaan Tanah Pembangunan Jalan Tol Padang-Sicincin di Kabupaten Padang Pariaman [Skripsi, Universitas egeri Padang]. http://repository.unp.ac.id/30847/
Astutik, H. P., & Dewanti, D. (2020). The Effect of Toll Gate Type on the Queue of Vehicles in Connecting Roads: A case study of Bawen – Yogyakarta Toll Road. Journal of the Civil Engineering Forum, 6(1), 1–12. https://doi.org/10.22146/jcef.43975
Atmojo, A. P. (2021). Problematika Pengadaan Tanah Untuk Jalan Tol Padang-Pekanbaru Dalam Perspektif Hukum Adat Di Kabupaten Padang Pariaman Provinsi Sumatera Barat. http://repository.stpn.ac.id/3656/1/AGUS%20PURWANTO%20ATMOJO.pdf, 14.
Ayu, W. P. A., & Putri, N. E. (2021). Implementasi Pembangunan Jalan Tol Ruas Padang-Sicincin dari Aspek Pengadaan Tanah. Jurnal Niara, 13(2), 23–28. https://doi.org/10.31849/niara.v13i2.4502
Brun, J.-F., Carrère, C., Guillaumont, P., & de Melo, J. (2005). Has Distance Died? Evidence from a Panel Gravity Model. The World Bank Economic Review, 19(1), 99–120.
cambridge.org. (n.d.). Social engineering. Https://Dictionary.Cambridge.Org/Dictionary/English/Social-Engineering. Retrieved December 8, 2021, from https://dictionary.cambridge.org/dictionary/english/social-engineering
Chinowsky, P., Diekmann, J., & Galotti, V. (2008). Social Network Model of Construction. Journal of Construction Engineering and Management, 134(10), 804–812. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(804)
Cleland, D., & Ireland, L. (2002). Project Management: Strategic Design and Implementation.
Debby, K. (2020). Penitipan Ganti Kerugian Dalam Pengadaan Tanah Untuk Pembangunan Jalan Tol Padang-Pekanbaru Sebagai Kepentingan Umum [Masters, UNIVERSITAS ANDALAS]. http://scholar.unand.ac.id/62496/
Dewi, A. R., Sutaryono, S., & Nurhikmahwati, A. (2020). Pemetaan Masalah Pengadaan Tanah dengan Objek Tanah Ulayat (Kasus Jalan Tol Padang-Sicincin). BHUMI: Jurnal Agraria Dan Pertanahan, 6(2), 277–291. https://doi.org/10.31292/bhumi.v6i2.454
Fandi, K. (2020). Pelaksanaan Ganti Kerugian Dalam Pengadaan Tanah Bagi Pembangunan Untuk Kepentingan Umum (Studi Kasus: Pembangunan Jalan Tol Padang-Pekanbaru, Sesi I Padang-Sicincin) [Diploma, Universitas Andalas]. http://scholar.unand.ac.id/57000/
Gochhayat, S. A. (2010). “Social Engineering by Roscoe Pound”: Issues in Legal and Political Philosophy (SSRN Scholarly Paper ID 1742165). Social Science Research Network. https://doi.org/10.2139/ssrn.1742165
Gunduz, M., & Almuajebh, M. (2020). Critical Success Factors for Sustainable Construction Project Management. Sustainability, 12(5), 1990. https://doi.org/10.3390/su12051990
Harza, M. F. (2021). Pergerakan Wacana Pembangunan Jalan Tol Ruas Padang-Sicincin Dalam Perspektif Teori Wacana Kritis [Masters, Fakultas Ilmu Budaya]. http://scholar.unand.ac.id/70145/
Hermawan, F. (2011). Pengaruh Pembebasan Lahan Terhadap Risiko Proyek Konstruksi (STudi Kasus Social Engineering Proyek Jalan Tol Ruas Semarang Bawen). 32, 7.
Kristiano, R., Suryana, & Supriatna, U. (2019). Perkembangan Sarana Dan Prasarana Transportasi Dalam Hubungannya Dengan Tingkat Perekonomian Masyarakat Di Desa Kolang Kecamatan Kuwus Barat, Kabupaten Manggarai Barat, Provinsi Nusa Tenggara. 19(2), 10.
Kusumojati, M. P. (2021). Peran Badan Pertanahan Nasional dalam mereduksi Perkara dan Konflik Sengketa Tanah melalui Mediasi [Undergraduate, Universitas 17 Agustus 1945 Surabaya]. http://repository.untag-sby.ac.id/7965/
Liandy, F. (2018). Faktor-faktor penyebab keterlambatan pada proyek Jalan Tol Trans-Sumatera Segmen Palembang—Lampung. https://repository.unpar.ac.id/handle/123456789/repository.unpar.ac.id/handle/123456789/6760
Lin, X., McKenna, B., Ho, C. M. F., & Shen, G. Q. P. (2019). Stakeholders’ influence strategies on social responsibility implementation in construction projects. Journal of Cleaner Production, 235, 348–358. https://doi.org/10.1016/j.jclepro.2019.06.253
Muhammad, F. (2019). Penentuan Ganti Kerugian Dalam Pengadaan Tanah Untuk Kepentingan Umum Dalam Pembangunan Jalan Tol Padang-Pekanbaru (Ruas Jalan Padang-Sicincin) [Diploma, Universitas Andalas]. http://scholar.unand.ac.id/48973/
Mulya, R., & Rizki, C. Z. (2016). Analisis Indikator Transportasi Untuk Pengembangan Ekonomi Wilayah di Kota Banda Aceh. 1(1), 11.
Muthalib, H. A. A. (2016). Keterkaitan Jalur Transportasi Dan Interaksi Ekonomi Kabupaten Konawe Utara Dengan Kabupaten/Kota Sekitarnya. 1, 16.
Naufal, M. R. (2019). Jagorawi Sebagai Jalan Tol Pertama Di Indonesia. http://repository.unpad.ac.id/frontdoor/index/index/docId/25481
oxfordlearndictionary.com. (n.d.). social-engineering noun—Definition, pictures, pronunciation and usage notes | Oxford Advanced Learner’s Dictionary at OxfordLearnersDictionaries.com. Retrieved December 8, 2021, from https://www.oxfordlearnersdictionaries.com/definition/english/social-engineering
Prasetyo, S. A., & Djunaedi, A. (2019). Perubahan Perkembangan Wilayah Sebelum Dan Sesudah Pembangunan Jalan Tol. Jurnal Litbang Sukowati : Media Penelitian dan Pengembangan, 3(1), 14. https://doi.org/10.32630/sukowati.v3i1.98
pu.go.id. (2021, August 7). Progres Fisik Capai 20,49%, Tol Padang – Sicincin Ditargetkan Beroperasi Desember 2021. Kementerian PUPR. https://pu.go.id/berita/progres-fisik-capai-20-49-tol-padang-sicincin-ditargetkan-beroperasi-desember-2021
Puri, W. (2017). Pluralisme Hukum sebagai Strategi Pembangunan Hukum Progresif di Bidang Agraria di Indonesia. BHUMI: Jurnal Agraria Dan Pertanahan, 3, 67. https://doi.org/10.31292/jb.v3i1.91
Rahayu, S. (2019). Perubahan sosial masyarakat Desa Kebonwaris akibat pembangunan jalan tol Pandaan-Surabaya / Sri Rahayu [Diploma, Universitas Negeri Malang]. http://repository.um.ac.id/65131/
Rajablu, M., Marthandan, G., Fadzilah, W., & Wan Yusoff, W. F. (2015). Managing for Stakeholders: The Role of Stakeholder-Based Management in Project Success. Asian Social Science, 11. https://doi.org/10.5539/ass.v11n3p111
Riri, S. (2021). Analisis Pemetaan Konflik Pembangunan Jalan Tol Padang-Pekanbaru (Studi Kasus Ruas Padang-Sicincin) [Diploma, Universitas Andalas]. http://scholar.unand.ac.id/77989/
San Cristóbal, J. R., Carral, L., Diaz, E., Fraguela, J. A., & Iglesias, G. (2018). Complexity and Project Management: A General Overview. Complexity, 2018, e4891286. https://doi.org/10.1155/2018/4891286
Siringoringo, L. F., & Lumbantoruan, W. (2015). Studi Perkembangan Prasarana Dan Sarana Transportasi Di Kabupaten Samosir Sejak Tahun 2006-2011. Tunas Geografi, 4(1), 45–50. https://doi.org/10.24114/tgeo.v4i1.5755
Siswoyo, M. (2020). The Impact of Toll Road Development: An Analysis Based on Public Administration Ecology. Journal of Southwest Jiaotong University, 55(3), Article 3. http://www.jsju.org/index.php/journal/article/view/643
Sumaryoto, S. (2010). Dampak Keberadaan Jalan Tol Terhadap Kondisi Fisik, Sosial, Dan Ekonomi Lingkungannya. Journal of Rural and Development, 1(2), Article 2. https://jurnal.uns.ac.id/rural-and-development/article/view/23808
Sumual, C. U. R. (2020). Kedudukan Tugas Dan Fungsi Kantor Pertanahan Dalam Rangka Endaftaran Tanah Berdasarkan Uupa Dan Pp No. 24 Tahun 1997. Lex Administratum, 8(3), Article 3. https://ejournal.unsrat.ac.id/index.php/administratum/article/view/29750
Susanto, N. (2019). Public (Dis)Engagement in Toll Road Project: A Case Study from Indonesia. JKAP (Jurnal Kebijakan Dan Administrasi Publik), 23(1), 77–91. https://doi.org/10.22146/jkap.43994
Urrahmi, M., & Putri, N. E. (2020). Manajemen Konflik Pengadaan Tanah Pembangunan Jalan Tol Padang-Sicincin. Jurnal Manajemen Dan Ilmu Administrasi Publik (JMIAP), 9–17. https://doi.org/10.24036/jmiap.v2i2.119
Yang, J., Shen, G. Q., Drew, D. S., & Ho, M. (2010). Critical Success Factors for Stakeholder Management: Construction Practitioners’ Perspectives. Journal of Construction Engineering and Management, 136(7), 778–786. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000180
Zuo, J., Jin, X.-H., & Flynn, L. (2014). Social Sustainability in Construction – An Explorative Study. International Journal of Construction Management, 12, 51–63. https://doi.org/10.1080/15623599.2012.10773190
DOI: https://doi.org/10.33559/eoj.v4i2.1058
Refbacks
- Saat ini tidak ada refbacks.
Negara Pengunjung

Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.