ANALISIS FAKTOR-FAKTOR YANG BERKONTRIBUSI KETERLAMBATAN PROYEK KONSTRUKSI TEKNIK SIPIL PADA JASA KONSTRUKSI BANGUNAN DI SUMATERA BARAT
Sari
Teks Lengkap:
PDFReferensi
Assaf, S.A., M. Al-Khalil and M. Al-Hazmi, 1995. ‘Causes of Delay in Large Building Construction Projects’, Journal of Project Management in Engineering ASCE, 2: 45-50.
Assaf, S.A. and S. Al Hejji, 2006. ‘Causes of delay in large construction projects’, International Journal of Project Management, 24: 349-357.
Al-Momani, A.H., 2000. ’Construction delays: a quantitative analysis’, International Journal of Project Management, 18(1): 5-9.
Bon G. Hwang, Lay P. Leong, 2013. ‘Comparison of schedule delay and causal factors between traditional and green construction projects’, Technological and Economic Development of Economy, 19: 310-330.
Chan, D.W.M. and M.M. Kumaraswamy, 1997. ‘An evaluation of construction time performance in the building industry’, Journal of Building and Environment, 31(6): 569-578.
Daniel W.M. Chan, Mohan M. Kumaraswamy, 1996. ‘An evaluation of construction time performance in the building industry’, Building and Environmental, 31: 569-578.
Frimpong, Y., J. Oluwoye and L. Crawford, 2003. ‘Causes of delay and cost overruns in construction of ground water projects in developing countries; Ghana as a case stud y’, International Journal of Project Management, 21: 321-326.
Mohan M. Kumaraswamy, Daniel W.M. Chan, 1998. ‘Contributors to construction delays’, Construction Management and Economics, 16: 17-29.
Murali Sambasivan, Yau Wen Soon, 2007. ‘Causes and effects of delays in Malaysian construction industry’, International Journal of Project Management, 25: 517-526.
Odeh, A.M. and H.T. Battaineh, 2002. ‘Causes of construction delay: Traditional contracts’. International Journal of Project Management, 220: 67-73.
DOI: https://doi.org/10.33559/eoj.v5i1.1229
Refbacks
- Saat ini tidak ada refbacks.
Negara Pengunjung

Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.










