TINJAUAN PELAKSANAAN PEKERJAAN ABUTMENT PEMBANGUNAN FLYOVER GELUMBANG PADA BATAS KAB. OGAN ILIR / BATAS KAB. MUARA ENIM – BATAS KOTA PRABUMULIH (PROVINSI SUMATERA SELATAN)
Sari
A bridge is a construction structure made to cross ravines or obstacles such as rivers, lakes, rivers, railways or highways, the construction of the Fly Over is motivated by frequent long traffic jams. With the increase in transportation in the area that causes traffic jams and hampered economic activities from one region to another that almost every day occurs, thus the Palembang city government works Similar to the Muara Enim Regency Government also trying to break down the congestion that exists in Gelumbang District and in Palembang City, the construction will be carried out around the railway crossing on the Palembang - Prabumulih causeway as well as connecting Ogan Ilir Regency / Muara Enim Regency.
Keywords: Abutment for Fly Over construction.
Teks Lengkap:
PDFReferensi
Bowles, K, E. 1992. Analisis Dan Desain Fondasi. Jilid , Edisi keempat: Erlangga. Jakarta.
Girsang P., 2009. Analisa Daya Dukung Pondasi Bored Pile pada Proyek Gedung Crystal Squere Jalan Imam Bonjol. No.6 Medan: Universitas Sumatera Utara.
Supriyadi, Bambang dan Muntohar, Agus S., 2007, Jembatan, Beta Offset, Yogyakarta.
Kementrian Pekerjaan Umum. 2017. Modul 4 - Produksi dan Pengangkutan Campuran Beton. Bandung: Kementrian Pekerjaan Umum.
Haryadi & Prakoso Widjojo Adi. 2023. Analisis Statistik Hasil Uji Kapasitas Metode Dinamis ( PDA TEST ) Pada Pondasi Tiang Pancang Sistem Pancang Tekan. Jurnal: Wahana Teknik Sipil. Vol. 28, No. 1, Juni 2023.
(uma.ac.id) View of Pengerjaan Abutment Pada Proyek Penggantian Jembatan Idano Eho – Desa Siforoasi – Kecamatan Amandraya – Kabupaten Nias Selatan
PT Eticon Rekayasa Teknik Mengenal Lebih Dekat dengan Alat Bore Pile yang Penting Bagi Pondasi Bangunan
Microsoft Word - Pelaksanaan pekerjaan beton utk jl & jemb. _FINAL_ .doc (pu.go.id)
Budi Hrtanro & PraksoWidjojo. Pekerjaan Abutment - Pekerjaan Bangunan Bawah & jemb. _FINAL_ .doc (pu.go.id)
Heri Suyitno Abdi Dalan: Bore Pile Sistem Kering (herisyn.blogspot.com)
(99+) Bagian III AHSP Bidang Bina Marga - PERMENPU No.1 Tahun 2022 | Delfia Diana Putri - Academia.edu
DOI: https://doi.org/10.33559/eoj.v6i2.2228
Refbacks
- Saat ini tidak ada refbacks.
Negara Pengunjung

Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.