STRATEGI MENGURANGI KETERLAMBATAN PEKERJAAN KONSTRUKSI GEDUNG BERTINGKAT
Sari
This research aims to identify the causes, impacts and mitigation strategies for delays in multi-storey building construction projects. Construction project delays are a common problem that can result in increased costs, reduced reputation, and conflict between stakeholders. This study uses a combination of quantitative and qualitative approaches, involving 100 respondents consisting of project managers, contractors, architects and other stakeholders, and analyzing data through questionnaire surveys, in-depth interviews and case studies. The research results identified five main causes of delays: ineffective planning and scheduling, lack of resources, design and specification changes, financial problems, and weather and field conditions. The impacts resulting from delays include increased project costs, decreased contractor reputation, and conflicts and disputes between related parties. Effective mitigation strategies include increased detail and realism in planning, use of technology such as Building Information Modeling (BIM) and cloud-based project management systems, proactive risk management, effective resource management, and regular training programs for the workforce. This research concludes that by implementing these strategies, delays in multi-storey building construction projects can be minimized, increase project efficiency, and ensure project completion according to the predetermined schedule and budget. These findings provide valuable insights for practitioners and academics in the field of construction management to overcome the problem of project delays.
Keywords: construction delays, multi-storey buildings, project planning, risk management, BIM technology, workforce training
Teks Lengkap:
PDFReferensi
Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593-599.
Alwi, S., Hampson, K., & Mohamed, S. (2002). Non value-adding activities in Australian construction projects. Proceedings of the International Conference on Construction in the 21st Century.
Arditi, D., Akan, G. T., & Gurdamar, S. (1985). Reasons for delays in public projects. Construction Management and Economics, 3(3), 171-181.
Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-357.
Azhar, S., Khalfan, M., & Maqsood, T. (2012). Building Information Modeling (BIM): Now and Beyond. Australasian Journal of Construction Economics and Building, 12(4), 15-28.
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489
Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing country; Ghana as a case study. International Journal of Project Management, 21(5), 321-326.
Hwang, B. G., Zhao, X., & Gay, M. J. S. (2013). Public private partnership projects in Singapore: Factors, critical risks and preferred risk allocation from the perspective of contractors. International Journal of Project Management, 31(3), 424-433.
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), 83-94.
Mansfield, N. R., Ugwu, O. O., & Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4), 254-260.
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517-526.
Zou, P. X., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), 601-614.
DOI: https://doi.org/10.33559/eoj.v6i4.2431
Refbacks
- Saat ini tidak ada refbacks.
Negara Pengunjung

Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.