ANALISIS PRODUKTIVITAS TENAGA KERJA UNTUK PEKERJAAN PONDASI DAN SLOOF PROYEK PEMBANGUNAN PERUMAHAN TALAGO GREEN ASRI KABUPATEN AGAM

Sepri Wahyudi, Helny Lalan, Robby Hotter, Dyla Midya Octavia

Sari


General development in the province of Western Sumatra has shown a fairly good and rapid improvement. It can be seen in one of the districts of Agam district which is located in the district of Basung Lubuk which is the construction of subsidized housing. In the development of the workforce in the construction industry is an important factor in measuring the performance of a company. Employee productivity is one of the factors affecting the success of the project. In this case, how much productivity can improve the quality of work. In this research use mixed methods, qualitative and quantitative. By taking concepts based on experience that often happens in the field and is general. Types of jobs observed are foundation and sloof jobs. Data collection techniques using field survey data, calculating jobs and documentation. The results of the data analysis are presented in the form of graphs and presentation tables. Based on the results of the research, then it can be said that the work of foundation and sloof was productive, with the analysis of the data of LUR all labor earned more than 50%. The highest productivity result (LUR) on the job of anstampang was of 78,575%, work of sand grinding under the foundation was of 75,975%, then the pair of stone foundation times of 67,045%, and the grinding of the ground was of 66,73%. The highest yield of productivity (LUR) in cutting was 70.11%, then cutting work was 64.84%, and casting of K-175 concrete sloof was 58.89%.

 

Keywords:  Productivity, Labor Utilization Rate (LUR), Funding, Sloof


Teks Lengkap:

PDF

Referensi


Alami, N., Aziz, U. A., & Margiarti, D. (2021). Studi Komparasi Perbandingan Rencana Anggaran Biaya Antara Metode Analisa Harga Satuan Pekerjaan (AHSP) Dan Standar Nasional Indonesia (SNI). Surya Beton: Jurnal Ilmu Teknik Sipil, 5(1), 10–19.

Bagaskara, F. G., & Priyanto, B. (2023). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Plesteran Dinding Proyek Masjid Mibas. Journal Of Civil Engineering Building And Transportation, 7(1), 212–217.

HA, A. H. (2015). Studi Perbandingan Pondasi Batu Kali, Pondasi Strauss Dan Pondasi Plat Setempat Rumah Tinggal 2 Lantai Tipe 85/72 Dilihat Dari Biaya, Waktu, Dan Metode Pelaksanaan. Seminar Nasional Sains Dan Teknologi Terapan III 2015 Institut Teknologi Adhi Tama Surabaya, 13.

Handa, V. K., & Abdalla, O. (1989). Forecasting Productivity By Work Sampling. Construction Management And Economics, 7(1), 19–28.

Hanggono, S. A. (2016). Analisis Koefisien Harga Satuan Tenaga Kerja Di Lapangan Dengan Membandingkan Analisis Sni Pada Struktur Bangunan Gedung Pemerintahan. Universitas Sumatera Utara.

Jonnaidi, D. S. (2021). Analisis Produktivitas Tenaga Kerja Dengan Metode Work Sampling. Universitas Islam Riau.

Kartika, N., Robial, S. M., & Pratama, A. (2021). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Kolom Di Proyek Pembangunan Gedung Pemda Kabupaten Sukabumi. Jurnal Momen Teknik Sipil, 3(2), 103–112.

Marwahyudi, M., & Safarizki, H. A. (2020). Kuat Tekan Design Batu Bata Berbahan Tambah Blotong (Peningkatan Kinerja Seismic). Universitas Islam Indonesia.

Ridha, M. R. (2021). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Struktur Beton Bertulang Menggunakan Metode Time Study Di Proyek Pembangunan Gedung Ruang Kantor Sekolah Menengah Atas Negeri 5 Banjarmasin. Universitas Islam Kalimantan MAB.

Rizaldi, A. F. (2021). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Pasangan Batu Dengan Metode Work Sampling Dan Historical Experience (Studi kasus: Proyek Jalan dan Jembatan Diro, Sendangmulyo, Minggir, Sleman, Yogyakarta).




DOI: https://doi.org/10.33559/eoj.v6i4.2478

Refbacks

  • Saat ini tidak ada refbacks.


Jumlah Kunjungan

Negara Pengunjung

Flag Counter

Lisensi Creative Commons
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.