STUDI PENGARUH BACK FLASHOVER PADA SALURAN TRANSMISI 150 kV PAYAKUMBUH - KOTO PANJANG
Sari
Teks Lengkap:
PDFReferensi
S. K. Supriana, “ Studi Pengaruh Uprating Saluran Transmisi Tegangan Tinggi 150 kV Terhadap Setting Rele Jarak Antara GI Kapal – GI Padang Sambian – Gi Pesanggaran. ” E-Journal SPEKTRUM, Vol. 1, No. 1,pp.59-64,2014.
Y. Warmi and K. Michishita, “ Lightning Trip-Out of 150 kV Transmission Line: a Case Study. ” International Review of Electrical Engineering (I.R.E.E.), Vol. 12, No 3. june, pp. 260-266, 2017.
Y. Warmi, and K. Michishita, “Investigation of Lightning Tripouts on 150-kV Transmission Lines in West Sumatra in Indonesia.” IEEJ Transactions on Electrical and Electronic Engineering, Vol. 11, No. 5, pp. 671-673, 2016.
N. J. Manik, E. Ervianto, “ Pengaruh Tahanan Kaki Menara Type Gantry Terhadap Terjadinya Back Flashover Pada Isolator Saluran 115 kV PT. Chevron Pacific Indonesia ” JOM FTEKNIK Volume, Vol. 2, No. 1, pp. 1-10, 2015.
R. Z. d. E. Y. Pramono2, “Lightning Performance of Extra High Voltage 500 kV Lines at East Java- Indonesia” The Journal for Technology and Science, vol. 19, no. 4, 2008.
T. Aryo Nugroho, G. Ngurah Satriyadi, M. Yulistya (2012), “Studi Pengaruh Back flashover pada Sistem Pentanahan Menara Saluran Transmisi Tegangan Tinggi Terkonsentrasi Menggunakan ATPDraw“.
DOI: https://doi.org/10.33559/eoj.v2i3.536