ANALISIS FAKTOR - FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PEMBANGUNAN PROYEK PONDOK PESANTREN NURUL ILMI KAB. BANYUASIN

Murni Ardiyanti, Firdaus Firdaus

Sari


In the construction of a building, there are many factors that must be taken into account, one of which is the delay factor in a project, because in the implementation of construction projects things often happen that do not go according to plan, such as delays in completion time. This can result in losses, special attention needs to be paid to delays, so that this can be minimized. This research uses a quantitative descriptive method by conducting interviews and distributing questionnaires to find the factors that most influence the causes of time delays. The data obtained is processed using statistical analysis using SPSS software. From the results of the analysis tests it is found that the variables that are the most influential factors are Design changes made by the owner are delays, lack of labor causes low work results, and cost overruns are the most influential factors. Based on these factors, control efforts are formulated that can minimize this in the form of preventive and corrective actions.

Teks Lengkap:

PDF

Referensi


Anonim, Undang-Undang Republik Indonesia nomor 18 tahun 1999, tentang Jasa

Kontruksi.

Arikunto, Suharsimi. (2006: 130) Prosedur Penelitian Suatu Pendekatan Praktik. Jakarta: Rineka Cipta.

Arifal Hidayat, 2004, Faktor-faktor penyebab keterlambatan diproyek konstruksi.

Austen A.D., dan R.H. Neale, 1994, Manajemen Proyek Konstruksi Pedoman, Proses dan Prosedur, PPM dan PT Pustaka Binaman Pressindo, Jakarta.

Barrie,& Donald S. (1984). Manajemen Konstruksi profesional / Donald S.Barrie, Byd C. Paulson, Jr. ; alih bahasa Sudinarto. Jakarta : Erlangga.

Istimawan Dipihusodo, 1996, Manajemen Proyek dan Konstruksi jilid 1 dan 2, Kan Nisius, Yogyakarta.

Jervis, B.M. & Levin, P., 1988, Construction Law, McGraw-Hill, Inc.

Soeharto I, 1995. Manajemen Proyek dan Konseptual Sampai Operacional Earlangga, Jakarta.

Sugiyono, 2008, Metode Penelitian Kuantitatif, Kualitatif dan R&D, Bandung : Alfabeta.

Supriono Lyla (2015). Faktor – Faktor Resiko Keterlambatan Pembangunan Proyek Infrastruktur Perdesaan Berdasarkan Waktu Perencanaan (Studi Kasus: Proyek PPIP Kec.Bringin Kab.Ngawi). Surabaya: Universitas 17 Agustus 1945.

Suyatno (2010). Analisis Faktor Penyebab Keterlambatan Penyelesaian Proyek Gedung (Aplikasi Model Regresi). Semarang: Universitas Diponegoro.

Singaribun K Efendi S, 2000, Metode Penelitian survei, PT. Pustaka LP3 Indonesia, Jakarta.

Singgih Santoso, 2001, Cara kerja Proses Perhitungan dengan SPSS.

Trihendradi C, 2009. 7 Langkah Mudah Melakukan Analisis Statistik Menggunakan SPSS 17. Penerbit ANDI Yogyakarta

Tarore Huibert, Mandagi Robert J.M., 2006. Sistem Manajemen Proyek dan Konstruksi (SIMPROKON), Tim Penerbit JTS Fakultas Teknik Unsrat Manado.

Tri Vadli Setia Budi, 2001, Faktor penyebab keterlambatan proyek konstruksi Bangunan Gedung.

Wijaya, 2000, Ststika non parametrik (Aplikasi program SPSS), penerbit Alfabeta, Bandung.




DOI: https://doi.org/10.33559/eoj.v6i1.2019

Refbacks

  • Saat ini tidak ada refbacks.


Jumlah Kunjungan

Negara Pengunjung

Flag Counter

Lisensi Creative Commons
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.