Sari


From the results of this research, the average field productivity value was 4.41 m³/person for foundation work, 4.54 m³/person for casting work, 1,017.46 kg/person for iron work, and 14.32 m²/person for formwork work. The productivity value according to SNI is 0.938 m³/person for foundation work, 4 m³/person for casting work, 200 kg/person for steel work, and 4.24 m²/person for formwork work. Then the productivity value according to the PUPR Ministerial Decree is 0.67 m³/person for foundation work, 4 m³/person for casting work, 71.46 kg/person for steel work, 9.09 m²/person for formwork work. There are quite significant differences for all jobs when compared with the reference (SNI 7394-2008 and PUPR Ministerial Regulation 28-2016). In foundation work, the comparison of field productivity with SNI is 4.71 times and with the PUPR Ministerial Regulation is

6.58 times. In casting work, field productivity with SNI and PUPR Ministerial Regulations is the same, namely 1.135 times. In steel work, the comparison of field productivity with SNI is 5.09 times and with the PUPR Ministerial Regulation is 14.24 times. In formwork work, the comparison of field productivity with SNI is 3.38 times and with the PUPR Ministerial Regulation is 1.58 times..

Keywords: Labor Productivity, PermenPUPR, Indonesian National Standards


Teks Lengkap:

PDF

Referensi


Agnese Therese Lagonda1), Pingkan A.K Pratasis2), Jermias Tjakra3). Analisis Penerapan Produktivitas tenaga kerja Pada Proyek Konstruksi

Ardani1), Syahrizal2), Alferido Malik3). 2010. Analisa Penerapan Produktivitas tenaga kerja Pada Proyek Konstruksi. Sumatra Utara

Fiki Aryani1), Rafie2), Syahruddin3). Analisa Penerapan Produktivitas tenaga kerja Pada Proyek Konstruksi Jalan Lingkungan Lokasi Kalimantan Barat

Hariandja1), Marihot Tua Efendi2). 2002. Manajemen Sumber Daya Manusia, Grasindo, Jakarta.

Mumtaz Almukaffa Ayatullah1) , Anik Sarmingsih2), Syafrudin3). Analisis Produktivitas tenaga kerja Pada Proyek Pembangunan Jalan Parang Garuda East Kawasan Industri Kendal

PermenPUPR28-2016.

Ronny Walangitan. (2012). Produktivitas Tenaga Kerja Dengan Menggunakan Metode Work sampling Pada Pekerjaan Kolom dan Balok Mega Trade Center Manado.

SNI 7394-2008.

Syahreza Taruna. 2015. Analisa Penerapan Produktivitas tenaga kerja Pada

Proyek Pembangunan Gedung Pendidikan Terpadu Politeknik Negeri Manado. Manado




DOI: https://doi.org/10.33559/eoj.v7i1.2653

Refbacks

  • Saat ini tidak ada refbacks.


Jumlah Kunjungan

Negara Pengunjung

Flag Counter

Lisensi Creative Commons
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.