This study aims to analyze the selection and productivity of heavy equipment in coal hauling services. The analysis method is carried out by evaluating various types of heavy equipment used, including excavators, trucks, and bulldozers, as well as factors that affect their efficiency. Data were collected through field observations and interviews with operators. The results of the study indicate that the selection of the right heavy equipment can increase productivity and reduce operational costs. These findings are expected to provide guidance for coal hauling service companies in selecting optimal equipment to improve project performance and profitability.
Keywords: heavy equipment selection, productivity, coal transportation services, efficiency, operational costs.
Teks Lengkap:
PDFReferensi
Rasyid, R (2008), Analisis Produktivitas Alat-alat Berat Proyek, Tugas Akhir S1
Jurusan Teknik Sipil Universitas Islam Indonesia, Yogyakarta.
Wahyudin, F, (2017), Analisis Pemilihan Kombinasi Alat Berat Pada Pekerjaan Pemindahan
Tanah Proyek Pembangunan Rumah Sakit UII, Tugas Akhir Jurusan Teknik Sipil
Universitas Islam Indonesia, Yogyakarta.
Indriatma, B dan prasetyo, I (2005), Analisis Manajemen Alat Berat Pada Pekerjaan Persiapan Proyek Studion Sleman, Tugas Akhir Jurusan Teknik Sipil Universitas Islam Indonesia, Yogyakarta.
Santoso, R (2013), Analisis Manajemen Alat Berat Berdasarkan Nilai Biaya Dan Waktu Optimal Produktivitas, Tugas Akhir Jurusan Teknik Sipil Universitas Islam Indonesia,
Yogyakarta.
Rochmanhadi, (1982), Alat Alat Berat Dan Penggunaannya, Departemen Pekerjaan Umum,
Jakarta.
DOI: https://doi.org/10.33559/eoj.v7i1.2706
Refbacks
- Saat ini tidak ada refbacks.
Negara Pengunjung

Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.