ANALISIS RISIKO PELAKSANAAN PROYEK RENOVASI SDN 14 SIMPANG AMPEK SUNGAI PUA MENGGUNAKAN NVIVO

Reza Azzahra, Surya Eka Priana, Ishak Ishak

Sari


Renovation projects face uncertainty because existing building conditions may differ from initial plans, triggering scope changes and interconnected risks. This study aims to analyze risks in the renovation project of State Elementary School (SDN) 14 Simpang Ampek Sungai Pua and identify mitigation responses. A qualitative approach was employed through interviews with planners, supervisors, and lead foremen. Data were analyzed using NVivo 15 through coding, thematic grouping, and visualizations including Project Map, Mind Map, Hierarchy Chart, and Word Frequency Query. The findings identified six themes: schedule, cost, material, technical, and resource risks, and risk mitigation. Schedule-related risk was the dominant theme at 29%. The findings indicate that risks are interrelated and require mitigation through RAB evaluation, material control, local material use, stakeholder coordination, and design adjustments.

Keywords: Risk Management; Renovation Project; Construction Risk; NVivo 15; Risk Mitigation

Teks Lengkap:

PDF

Referensi


Eka A, Safaria F, & Susetyaningsih A. (2019). Analisis Manajemen Risiko Pelaksanaan Proyek Konstruksi. Jurnal Konstruksi, (1), 28–36. http://jurnal.sttgarut.ac.id/

Komang Agus Ariana, I., Wismantara, I., Nengah Riana, I., & Nyoman Galang Sunada Wibawa, I. (2025). Analisis Manajemen Risiko K3 pada Proyek Konstruksi (Studi Kasus: Proyek Pembangunan Gedung C Blok 2 Undiknas). Jurnal Teknik Sipil ITP, 12(1). https://doi.org/10.21063/JTS.2025.V1201.060-069

Kurniawan Deddy. (2018). 762-1715-1-PB. Rang Teknik Journal, 1(2).

Labombang, M. (2011). MANAJEMEN RiSIKO DALAM PROYEK KONSTRUKSI. SMARTek, 9(1), 39–46.

Rahardi, R., & Johari, G. J. (2021). Manajemen Risiko pada Proyek Bangunan Gedung di Kabupaten Tasikmalaya. Jurnal Konstruksi, 19(2), 511–519. https://jurnal.itg.ac.id/

Sutoni, A., & Rukma Kurniadi, D. (2019). Analisis Risiko dalam Construction Supply Chain: Studi Kasus pada Proyek Renovasi Gedung Kantor VEDCA. Jurnal Media Teknik & Sistem Industri, 3(2), 81–89. http://jurnal.unsur.ac.id/index.php/JMTSI

Tinambunan Yuli. (2024). 599. JEAMI, 3(No.01).

Zali, S., Mulyani, R., & Anif, B. (2025). Analisis Risiko Penyebab Keterlambatan Pekerjaan Konstruksi Gedung. Jurnal Teknik Sipil ITP, 12(1). https://doi.org/10.21063/JTS.2025.V1201.009-017




DOI: https://doi.org/10.33559/eoj.v8i13.4089

Refbacks

  • Saat ini tidak ada refbacks.


Jumlah Kunjungan

Negara Pengunjung

Flag Counter

Lisensi Creative Commons
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.